Skip to content

Isotrack Hex Slab

Versatile Ground Slabs for Temporary and Permanent Applications

Specifications
Outer width
18⅛”
Inner width
15¾”
Height
1⅝”
Weight per slab
3.75 lbs
Coverage per slab
1.5 ft²
Slabs per pallet
354
Coverage per pallet
531 ft²
Material
Hanit® / 100% recycled plastic
Connection
Interlocking hooks
Color
Gray or brown

Key Facts

graphic1

Technical Specification

Strength Testing

Hex Slab can be used indoors or outdoors for temporary or permanent installations. Independent load-bearing tests show that Hex Slab can take the weight of even SLW 60 heavy duty vehicles, depending on the ground below.

Hex Slab type
Test load
Crack detention
Breaking force
Closed
427 psi / 27 t/ft²
None
100 t/ft²
Slotted
285 psi / 18 t/ft²
None
67 t/ft²

Hex Slab is quick to install, easy to dismantle and ideal for events like exhibitions, shows and fairs.

Lay Hex Slab directly onto firm, stable and level ground or flooring and use immediately. If the ground is soggy grass or soft soil, install a roll out geogrid between the ground and Hex Slab. If the ground is very soft and boggy, Hex Slab is not recommended without further ground preparation. Contact HAHN for advice.

Hex Slab is strong, durable and perfect for permanent applications like drive ways and amenity areas.

» Step 1

Install an edge or curb to prevent movement of bedding materials. Make sure that the ground is strong enough to bear the expected loads. If not, lay 4–6” of free-draining compacted and levelled stone.

» Step 2

Cover the sub-base with a non-woven needle-punched geotextile layer (with 6” overlaps) to keep the sub-base and bedding layer separate. Install, compact and level a 1” bedding layer of sharp sand or grit.

» Step 3

Start from the edge or curb and install Hex Slab onto the bedding layer. Make sure the interconnecting hooks fit securely beneath each slab. Due to the hexagonal shape, a straight edge leaves a half slab gap – Hex Slab is easy to cut with a circular saw or standard woodworking tools (for tricky areas, avoid cutting to less than a third of a slab).

Work outwards from this first line, clicking further slabs together until the area is covered. For immediate use, bed the new paved area down with a nylon covered plate vibrator.